Úvod O společnosti English Summary

English Summary

Key data 2017

Turnover: CZK 7,118 billion

Number of people supplied:  1.29 million in Prague and 205.000 residents of the Central Bohemian Region

Number of employees: 1 014

Supplied water:  98,097,594 m3 

Water losses: 15,0 %

Quantity of treated wastewater: a total of 117,734,431 m3

 

Length of the operated water supply network, including supply pipes: 4,396 km

Length of the operated sewerage network, including drain pipes: 4,678 km

Number of contract customers: 90,712

PVK in 2017

PVK in 2016

 PVK_IN_2015.pdf

 PVK_in_2014_EN.pdf

PVK in 2013_EN.pdf (dokument Adobe PDF)PVK in 2013_EN.pdf

PVK_in_2012_EN.pdf (dokument Adobe PDF)PVK_in_2012_EN.pdf

PVK in 2011.pdf (dokument Adobe PDF)PVK in 2011.pdf

PVK in 2010.pdf (dokument Adobe PDF)PVK in 2010.pdf

Aktuální kvalita vody

Zákaznická linka

601 274 274

nebo

840 111 112 

 

Rezervace termínu

Chystáte se do našeho zákaznického centra? Rezervujte si čas schůzky předem!

Žádost o existenci inženýrských sítí

Potřebujete zjistit, zda na vašem pozemku jsou vodovodní a kanalizační sítě? Pak vyplňte žádost

a informace vám bude zaslána.